What Are the Values of APS Advanced Planning and Scheduling Systems?

Published on: 2025-01-15

What value does an APS advanced planning and scheduling system provide? An APS system is a software solution that uses algorithms and technology to optimize production planning and scheduling. In the complex environment of multi-variety, small-batch production, it demonstrates significant value and can help enterprises solve a series of problems related to production efficiency, cost control, and customer satisfaction.


The Value of APS Advanced Planning and Scheduling Systems


First Dimension: The Owner's Perspective

The owner told me that the greatest benefit is greater delivery flexibility and agility, along with a higher on-time delivery rate. In the past, sales and planning needed to be coordinated several times every month, but now that is basically unnecessary. In particular, the freezing window of their automated production line is 1.5. days, so customer expectations for delivery time are transparent and controllable. This is very helpful for sales.

The owner also said that the second benefit is greater production transparency. They can see the situation for the coming weeks, or even more than a month ahead, which greatly reduces anxiety. In particular, the automated production line does not want to perform changeovers at night because it runs 24 hours a day and night changeovers are troublesome. The goal of building a lights-out factory has also been achieved.

Second Dimension: Planners and the Planning Department

The daily workload of planners using Excel for scheduling has been greatly reduced. Their routine work has shifted from arranging schedules to confirmation, prevention, coordination, and command, and the focus of their work has changed significantly.

The monthly output of this enterprise increased from 15 million to 22 million and then to 27 million, nearly doubling, yet the number of planners did not increase. Management and coordination still follow a standardized rhythm.

Third Dimension: The Workshop

This enterprise has a relatively high management level and follows integrated planning management. Production tasks issued to workshops roll on a 1.5-day basis for automated workshops and a 4-day basis for non-automated workshops. Material distribution is initiated by the planning department and delivered to workstations, so management is quite rigorous.

Changeovers are handled by the workshop itself through dedicated mold-change workers, and a changeover plan is provided based on APS scheduling results. The workshop prepares changeover materials and personnel in advance according to the APS changeover schedule, reducing downtime and accelerating changeovers.

For the workshop, planning becomes stronger and orderliness improves. At the same time, changeover methods have been optimized. For example, products can be scheduled in linked sequences such as small, medium, large, medium, and small after processing requirements are considered.

One more point: because there is a changeover plan, machine downtime caused by changeovers has been reduced by at least 30 percent, indirectly increasing production capacity.

Fourth Dimension: Indicator Improvement

After the APS system went live successfully, performance improvements in two workshops were very obvious.

In the first workshop, the manufacturing cycle was shortened from 5.21 days to 2.03 days, and work in process was reduced by one-third. Production flexibility increased greatly.

In the second workshop, planning accuracy reached 100 percent, compared with less than 90 percent before, greatly improving delivery accuracy.


The Value of APS Advanced Planning and Scheduling Systems


The Soonfor APS advanced scheduling management system is an advanced planning and scheduling software system based on supply chain management and the theory of constraints. It uses advanced mathematical optimization algorithms and logic, comprehensively considers multiple constraints, and solves problems such as precise prediction of delivery dates and capacity, as well as optimal detailed planning for process production and material supply under limited capacity conditions. It is the intelligent brain for efficient enterprise operations.
Back to List >>
Copyright ©2020 中国·5357cc拉斯维加斯(股份有限公司)-Official website All Rights Reserved 版权所有 粤ICP备07004079号
Online Service| Sitemap | Legal Notice
Online Consultation
Submit Request
Contact Us
Hello, we are always here to help you

Call Soonfor

WeChat Consultation
Scan with your phone to add WeChat
Official Account
Scan to follow and leave a message
Back to Top
Free Consultation
Online Support
Submit Request
XML 地图